
Safety Program
Safety comes first on every Austral HVAC job. Our written Safety Program covers jobsite hazard reviews, PPE, fall protection on rooftops, lockout/tagout, electrical and refrigerant handling, toolbox talks, incident reporting and OSHA compliance. Every technician is trained on it before they start work, and we review it with our crew regularly.





A written program GCs and owners can review
Jobsite hazard reviews & PPE
We review hazards on the job and required personal protective equipment before work starts.
Fall protection & lockout/tagout
Rooftop fall protection and lockout/tagout procedures are part of the written program.
Electrical & refrigerant handling
The program covers electrical work and refrigerant handling on commercial HVAC and refrigeration jobs.
Toolbox talks, incidents & OSHA
Toolbox talks, incident reporting and OSHA compliance are reviewed with the crew regularly.
Where the program applies


1. Safety Policy Statement / Declaración de Política de Seguridad
| English | Español |
|---|---|
| Austral HVAC is committed to providing a safe workplace for every employee, subcontractor, and the public on every jobsite. No task is so urgent that it cannot be done safely. Working safely is a condition of employment. | Austral HVAC se compromete a proporcionar un lugar de trabajo seguro para cada empleado, subcontratista y para el público en cada obra. Ninguna tarea es tan urgente que no se pueda hacer de forma segura. Trabajar con seguridad es una condición del empleo. |
| Management provides training, equipment, and PPE. Every employee is responsible for following these rules, reporting hazards, and stopping work that cannot be done safely. We comply with all applicable OSHA standards (29 CFR 1926 / 1910). | La gerencia proporciona capacitación, equipo y EPP. Cada empleado es responsable de seguir estas reglas, reportar peligros y detener cualquier trabajo que no se pueda realizar de forma segura. Cumplimos con todas las normas aplicables de OSHA (29 CFR 1926 / 1910). |
2. OSHA Safety Program / Programa de Seguridad OSHA
2.1 Responsibilities / Responsabilidades
| Management: funds the program, provides PPE and training, reviews incidents, and enforces the rules. | Gerencia: financia el programa, proporciona EPP y capacitación, revisa los incidentes y hace cumplir las reglas. |
| Supervisors / Foremen: conduct toolbox talks, inspect the site daily, correct hazards, and report incidents. | Supervisores / Capataces: dirigen las charlas de seguridad, inspeccionan la obra a diario, corrigen peligros y reportan incidentes. |
| Employees: follow safe work practices, use PPE, report hazards and injuries, and exercise stop-work authority. | Empleados: siguen las prácticas de trabajo seguro, usan EPP, reportan peligros y lesiones, y ejercen la autoridad de detener el trabajo. |
2.2 Personal Protective Equipment (PPE) / Equipo de Protección Personal (EPP)
| Hard hat, safety glasses, and steel/composite-toe boots required on all active jobsites. | Casco, lentes de seguridad y botas con punta de acero/compuesto obligatorios en toda obra activa. |
| Cut-resistant gloves for sheet metal; insulated gloves for electrical work. | Guantes resistentes a cortes para lámina; guantes aislantes para trabajo eléctrico. |
| Hearing protection in high-noise areas; respirators where required by HazCom. | Protección auditiva en áreas de mucho ruido; respiradores donde lo requiera HazCom. |
| High-visibility vest when working near traffic or heavy equipment. | Chaleco de alta visibilidad al trabajar cerca de tráfico o maquinaria pesada. |
2.3 Key Hazard Controls / Controles de Peligros Clave
| Fall protection: 100% tie-off at 6 ft and above; inspect harnesses and lanyards before each use; guard floor/roof openings. | Protección contra caídas: amarre 100% a 6 pies o más; inspeccione arneses y cuerdas antes de cada uso; proteja aberturas en pisos/techos. |
| Ladders & lifts: inspect before use, 3-point contact, proper angle; only trained operators on scissor/boom lifts with required fall protection. | Escaleras y elevadores: inspeccione antes de usar, contacto de 3 puntos, ángulo correcto; solo operadores capacitados en elevadores de tijera/articulados con la protección requerida. |
| Electrical / LOTO: verify de-energized and lock out / tag out before servicing units; only qualified persons work on live circuits. | Eléctrico / LOTO: verifique que esté sin energía y aplique bloqueo/etiquetado antes de dar servicio; solo personas calificadas trabajan en circuitos energizados. |
| Refrigerants & HazCom: maintain SDS access, label all chemicals, ensure ventilation, use proper recovery procedures, never vent refrigerant. | Refrigerantes y HazCom: mantenga acceso a las SDS, etiquete todos los químicos, asegure la ventilación, use procedimientos de recuperación adecuados, nunca libere refrigerante. |
| Heat illness (Texas): water, rest, shade; acclimatize new workers; watch crew for symptoms during summer months. | Enfermedad por calor (Texas): agua, descanso, sombra; aclimate a los trabajadores nuevos; vigile al personal por síntomas en verano. |
| Tools & equipment: use guards, inspect cords, no damaged tools; brazing/hot work requires a fire extinguisher and a clear area. | Herramientas y equipo: use las guardas, inspeccione los cables, no use herramientas dañadas; el trabajo en caliente requiere extintor y área despejada. |
| Confined spaces: do not enter permit-required spaces without assessment, atmospheric testing, and an attendant. | Espacios confinados: no entre a espacios que requieren permiso sin evaluación, prueba atmosférica y un asistente. |
2.4 Incident & Injury Reporting / Reporte de Incidentes y Lesiones
| 1. Get first aid / medical care immediately for any injury. | 1. Obtenga primeros auxilios / atención médica de inmediato para cualquier lesión. |
| 2. Report every injury, near-miss, and property damage to your supervisor the same day. | 2. Reporte toda lesión, casi-accidente y daño a la propiedad a su supervisor el mismo día. |
| 3. Supervisor completes an incident report; preserve the scene for investigation when possible. | 3. El supervisor completa un reporte de incidente; preserve la escena para la investigación cuando sea posible. |
| 4. Serious incidents are reported to OSHA within required timeframes (fatality 8 hrs; hospitalization/amputation/eye loss 24 hrs). | 4. Los incidentes graves se reportan a OSHA dentro de los plazos requeridos (muerte 8 hrs; hospitalización/amputación/pérdida de ojo 24 hrs). |
2.5 Training / Capacitación
| New-hire safety orientation before first day on site. | Orientación de seguridad para nuevos empleados antes del primer día en la obra. |
| Task-specific training (fall protection, LOTO, lifts, HazCom) before performing the work. | Capacitación específica por tarea (protección contra caídas, LOTO, elevadores, HazCom) antes de realizar el trabajo. |
| All training documented and kept on file. | Toda la capacitación se documenta y se archiva. |
3. Drug & Alcohol Testing Policy / Política de Pruebas de Drogas y Alcohol
| Austral HVAC maintains a drug- and alcohol-free workplace. Reporting to work or performing any job duty under the influence of alcohol, illegal drugs, or impairing substances is strictly prohibited. The use, possession, sale, or distribution of these substances on company time or property is grounds for termination. | Austral HVAC mantiene un lugar de trabajo libre de drogas y alcohol. Está estrictamente prohibido presentarse a trabajar o realizar cualquier tarea bajo la influencia de alcohol, drogas ilegales o sustancias que afecten las facultades. El uso, posesión, venta o distribución de estas sustancias en tiempo o propiedad de la empresa es motivo de despido. |
| Test type / Tipo de prueba | When it applies / Cuándo aplica → Action / Acción |
|---|---|
| Pre-employment / Pre-empleo | All new hires before start → negative result required to begin work. / Todos los nuevos empleados antes de iniciar → se requiere resultado negativo para comenzar. |
| Reasonable suspicion / Sospecha razonable | Observed impairment, behavior, or smell → immediate removal from site pending result. / Deterioro, comportamiento u olor observado → retiro inmediato de la obra a la espera del resultado. |
| Post-accident / Post-accidente | Any injury, property damage, or near-miss → tested as soon as practical (within 24 hrs). / Cualquier lesión, daño a la propiedad o casi-accidente → prueba lo antes posible (dentro de 24 hrs). |
| Random / Aleatoria | Selected by neutral system year-round → refusal treated as a positive result. / Seleccionado por sistema neutral todo el año → la negativa se trata como resultado positivo. |
| Return-to-duty / Reincorporación | After a prior positive / program completion → negative + follow-up testing required. / Después de un positivo previo / fin del programa → se requiere negativo + pruebas de seguimiento. |
| Testing follows DOT-style collection and a certified lab / MRO review where applicable. | Las pruebas siguen la recolección estilo DOT y revisión de laboratorio certificado / MRO cuando corresponda. |
| Prescription medication that may impair performance must be disclosed to the supervisor before working. | Los medicamentos recetados que puedan afectar el desempeño deben informarse al supervisor antes de trabajar. |
| Refusing to test, tampering, or adulterating a sample is treated the same as a positive result. | Negarse a la prueba, manipular o adulterar una muestra se trata igual que un resultado positivo. |
| A confirmed positive results in removal from the jobsite and disciplinary action up to termination, consistent with company policy and law. | Un positivo confirmado resulta en el retiro de la obra y acción disciplinaria que puede llegar al despido, conforme a la política de la empresa y la ley. |
4. Safety Meetings / Juntas de Seguridad
| Weekly toolbox talk: held on each active jobsite, 10–15 minutes, led by the foreman, covering a job-specific hazard. | Charla de seguridad semanal: en cada obra activa, de 10 a 15 minutos, dirigida por el capataz, sobre un peligro específico del trabajo. |
| Pre-task / daily huddle: quick review of the day's scope, hazards, and PPE before work starts. | Reunión diaria previa a la tarea: repaso rápido del alcance del día, los peligros y el EPP antes de empezar. |
| Monthly company safety meeting: review incidents, trends, and program updates with all field staff. | Junta mensual de seguridad de la empresa: revisión de incidentes, tendencias y actualizaciones del programa con todo el personal de campo. |
| Documentation: every meeting uses a sign-in sheet (date, topic, attendees) kept on file. | Documentación: cada junta usa una hoja de asistencia (fecha, tema, asistentes) que se archiva. |
Approved by / Aprobado por: Alejandra N. Asencio, CEO/Owner, Austral Enterprises LLC. Need a signed copy for prequalification? Contact us / ¿Necesita una copia firmada para precalificación? Contáctenos.
Request a Bid